Horizons features top industry experts shedding light on the most complex and exciting topics in water today. Hear about significant projects and innovations that have helped our clients achieve their water, wastewater, reuse, and water resources goals—and could help you achieve yours. Get insights into all things water®, all in one place.

We use MailChimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to MailChimp for processing.
Learn more about MailChimp's privacy practices

Rehabilitation of Ferric Chloride Feed System and Sludge Lines

Hazen designed the new PS-1 ferric chloride storage and feed equipment to be installed in the same location as the PS-2 ferric chloride storage and feed system for conveyance of ferric to both the Oakwood and DRI/Jefferson Interceptors.

The primary method for removing phosphorus at Great Lakes Water Authority’s WRRF is by adding iron salts (ferric chloride) to the wastewater stream at each of the pump stations (PS-1 and PS-2) and then precipitating it out in the primary clarifiers.

email

Related Solutions:

PS1 2

Thickened sludge pumps transfer the sludge from Complex B to Complex A through a 1,600-LF, 16-inch pipeline, where it is blended inline with thickened primary sludge prior to storage in Sludge Storage Tanks. This pipeline has been clogged due to vivianite buildup.

Project Outcomes and Benefits

  • Designed improvements to the pipeline to provide redundancy, bypass connections, and cleanouts to ensure maintenance access and reliability in the future.
  • The co-location of the PS-1 and PS-2 tanks will allow for optimization of the storage volume by taking advantage of excess capacity in the PS-2 tanks and utilize existing infrastructure on site, reducing capital cost and long-term facility O&M costs.