all things water®

Contact Us

498 Seventh Ave, 11th Floor
New York, NY 10018

(212) 539-7000

Don’t Miss a Story

Horizons features top industry experts shedding light on the most complex and exciting topics in water today. Hear about significant projects and innovations that have helped our clients achieve their water, wastewater, reuse, and water resources goals—and could help you achieve yours. Get insights into all things water®, all in one place.

We use MailChimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to MailChimp for processing.
Learn more about MailChimp's privacy practices

Conventional BNR and State-of-the-art Sidestream System: Sustainable Treatment for the Future

The Hurricane Sandy Recovery Program, a partnership between Hazen and Sawyer and ARCADIS, was created to assist Nassau County in the long-term Hurricane Sandy recovery effort for the South Shore WRF facility (formerly known as the Bay Park STP). Nutrient removal was incorporated into the program as reduced nitrogen loading in the Western Bays will accelerate marshlands recovery, providing additional buffering from future storm events.

Nassau County entered into a Consent Agreement with New York State DEC whereby nitrogen loading into the Western Bays was to be reduced to the greatest extent possible. The Bay Park Conveyance Project will ultimately divert all dry weather effluent to an open ocean outfall, but the existing outfall in Hempstead Bay will still remain in service for wet weather and emergency use. Treatment upgrades to achieve approximately 10 mg/L of total nitrogen in the effluent was agreed to based on studies performed by Hazen, showing that could be achieved efficiently within the existing plant envelope via conventional BNR upgrades and sidestream centrate deammonification.

Eric Mills, PE

From Recovery to Sustainability

We worked on immediate storm recovery and long-term resiliency improvements to prepare for future storm events.

Project Outcomes and Benefits

  • Project scope and goals negotiated with regulators, with treatment goals and Consent Agreement milestones all met to date.
  • BNR improvements implemented and new nitrogen limit for SPDES compliance determined by 12 month operating period.
  • Sidestream system constructed and currently in testing phase.
  • Effluent quality improvements are improving water quality in the Western Bays.
SS10

The Annamox® sidestream deammonification system, in tandem with BNR, will reduce nitrogen loading in the Western Bays to accelerate marshlands recovery, providing additional buffering from future storm events.