Horizons features top industry experts shedding light on the most complex and exciting topics in water today. Hear about significant projects and innovations that have helped our clients achieve their water, wastewater, reuse, and water resources goals—and could help you achieve yours. Get insights into all things water®, all in one place.

We use MailChimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to MailChimp for processing.
Learn more about MailChimp's privacy practices

Co-Digestion of Biodiesel Waste at El Paso’s Haskell Street WWTP

Hazen partnered with Georgia Institute of Technology to perform bench-scale digestibility testing for El Paso Water Utilities (EPWU) to help ensure stable digester operation at the design loading rates and confirm digester gas production of the biodiesel waste.

El paso wwtp 1
An overview of the conceptual biodiesel and fats, oil, and grease receiving facility.
El paso wwtp 2

Haskell Street WTTP’s excess digester capacity can save over $500,000 year in purchased power by codigesting biodiesel wastes.

With a local biodiesel company hauling its liquid waste 200 miles away for disposal, Hazen and Sawyer assisted El Paso Water Utilities (EPWU) in evaluating the benefit of leveraging the excess anaerobic digester capacity at the Haskell Street WWTP for co-digestion of the biodiesel waste.

Scott A. Hardy, PE, PMP
El paso wwtp 3
Bench-scale testing by Georgia Institute of Technology showed synergistic impact of codigesting biodiesel waste with municipal sludge by increasing ultimate digestibility from 40% to 80%.

Project Outcomes and Benefits

  • Using the bench-scale results, Hazen determined that the digesters can maintain greater than a 15-day solids residence time (SRT) and a volatile solids loading rate of less than 0.16 lbs/cubic foot when receiving up to 60,000 gallons per day of biodiesel waste.
  • The additional digester gas production allows operating their existing 1 mega-watt combined heat and power (CHP) system at full load, resulting in over $500,000 of annual savings based on their current power rate structure.
  • The simple payback period for constructing the receiving station and the required digester infrastructure improvements was about 5 years.