Well Replacement and Rehabilitation to Restore Firm Capacity

Authors:

  • Eileen Murphy PE - Hazen and Sawyer

The plight of aging infrastructure, an aging work force, and financial constraints have forced water utilities into a reactionary state foregoing scheduled maintenance and heading straight to capital construction and emergency repair. Using the East Orange System as a case study, the presentation will provide:

- An overview of the East Orange Water System; the struggle to meet firm capacity and where they are today. – Review of the fundamental steps of Well Replacement and Well Rehabilitation will be covered along with the construction schedule and maintenance of existing operations. – Review of the Drilling Methods, and Construction Issues encountered during well replacement. – Review of the types of equipment and rehabilitation methods used at East Orange and the level of success achieved. – Finally, a review of key monitoring parameters and recommended maintenance for groundwater systems will be covered to improve system reliability.

For more information, please contact the author at emurphy@hazenandsawyer.com.

Hear about new publications with our email newsletter

We will never share your details with anyone else.

Horizons

Newsletter Newsletter

Horizons Fall 2017 (pdf)

Horizons showcases significant water, wastewater, reuse, and stormwater projects and innovations that help our clients to achieve their goals, and can help you achieve yours. Articles are written by top engineers and process group leaders, demonstrating and explaining the beneficial application of a variety of technologies and tools.

View previous issues »