The 6.0 mgd Manasquan WTP was first put online in 1989 and had a filter retrofit in 2003.

The filtration zone at the Manasquan WTP includes an underdrain pipe embedded in unreinforced fill concrete and a conventional filter arrangement (sand and anthracite supported by gravel).

Filters are used in conventional treatment to remove particles from the process flow. Filters store particles – require backwashing to remove trapped solids. The typical filter run time = between 24 and 72 hours (depending on source water quality).

Backwash duration can vary depending on goals (high rate and low rate washes, air assist, etc.). Typical backwash rates are14 – 22 gpm/ft2 but backwash rate will vary with water temperature (viscosity).

To ensure appropriate distribution of backwash flow, underdrain geometry is designed to achieve appropriate backwash flow velocities.

The repaired filter system eliminates porous plate and uses stainless steel underdrain laterals with a knife edge.

Filtration is a crucial step of the water treatment process, and one that continues to be revised, improved and refined today. Plant operators are tasked with the challenges of getting the most out of their filters as well as incorporating new technologies into existing plants to reap the benefits of improvements in technology associated with new filtration products and operational methods.

Depending on operational goals, restrictions associated with the existing units including the availability of capital, the rehabilitation and subsequent optimization of a filter can take a variety of different paths. While there certainly are dozens of ways to reach the desired end results, there are undeniably a handful of crucial investigations and design considerations that must be intensely engaged in to ensure a successful filter rehabilitation project.

This presentation will touch on a handful of challenges a designer must consider in the rehabilitation of a filter that can easily be oversimplified or even worse, overlooked, and elaborate by demonstrating how these challenges manifested themselves uniquely in a number of recent filter rehabilitation projects in the Philadelphia area.

- Philadelphia Water Department’s Queen Lane WTP – A recently completed project at the Queen Lane WTP included the rebuild the underdrains of two filter units and saw the installation of water proof coating systems in the gullets of another four filters. The plant, originally completed in the early 1900’s and substantially upgraded in the 1950’s, contributed a substantial number of unique features associated with the vintage of the original construction.

- New Jersey American Water’s Swimming River and Jumping Brook WTPs – A suspected underdrain failure (associated with substantial media discovered in the underdrain plenum) lead to an intense investigation of the problem, as well as the subsequent inspection of all other filtration units (8 total) at the plants. The project demonstrated the importance of consistent filter monitoring during normal operations and inspection to ensure reliability of units. The original investigation and subsequent repairs of the failed underdrain were completed in 2014 and continued inspections occur annually.

- New Jersey Water Supply Authority’s Manasquan WTP – One of the three filters at the Manasquan WTP experienced the uplift and failure of the underdrain during a normal backwash cycle at the beginning of the summer of 2016 which lead to the emergency design of repairs within that filter, to also be installed in the two other filters at the plant in the future. Prior to the design of a new underdrain system, the causation of the failure was determined which demonstrated a number of oversights in the existing underdrain system design. The project, slated for completion in early 2017, presented a very unique retrofit with numerous design obstacles which limited the viable alternatives for a robust, reliable final repair.

For more information, please contact the author at jnaumick@hazenandsawyer.com.

Hear about new publications with our email newsletter

We will never share your details with anyone else.

Horizons

Newsletter Newsletter

Horizons Fall 2017 (pdf)

Horizons showcases significant water, wastewater, reuse, and stormwater projects and innovations that help our clients to achieve their goals, and can help you achieve yours. Articles are written by top engineers and process group leaders, demonstrating and explaining the beneficial application of a variety of technologies and tools.

View previous issues »